This is a pool we recently completed that makes us very proud, and our client very happy. This pool construction project was started by another builder back in October 2018. For some unknow reason the original contractor walked off the job that December and never returned. After much stress, and legal entanglements, the client hired us to finish the project. To make matters worse the original contractor  assembled the pool 18” too high above the patio outside the client’s walkout basement. Had they actually completed the pool the client would have had their finished basement flooded with runoff from the pool deck the first time it rained. We completely unassembled the pool, re-graded the entire backyard, lowered the pool to the correct elevation, and re-built them a beautiful pool.